8am – Moi, Dylan, Dave
5 ton, 5-7 hours; optical lab (bring tools and step stool); White Rock to Surrey
8 pieces including 1 Air Comp 20 gal and 1 Air tank 50 gal. Need to take down 3 shelves 4’ x 8’ (wall mounted) – screwed on. Everything is already on dollies except the shaker and the 50 gal tank is not on a dollie; two large L-shaped couches – May have to take the door off.